Multimodal container and warehouse terminal to service cargo flows of Novorossiysk seaport
Location
The object is located in the city of Novorossiysk n. Gayduk, distance to the seaport - 8 km
Description
Multifunctional container and warehouse terminal, which occupies an area of > 7 hectares, The area of dry warehouses is > 15,000 sq.m. The total area of all buildings is > 25000 sq.m. Concrete container yards - 54000 sq.m. 1 - Dry warehouse, class A 5 - Dry warehouses, class B 4 - Container yards
Technical equipment
The terminal has direct exits to the technological road to seaports and port container terminals. Warehouses are equipped with ventilation systems, office spaces are air-conditioned, and a hydrant fire extinguishing system is installed. Cross-docking of dry and temperature cargoes. Platform for charging, storage and servicing of REF containers. Oil transfer and grain complexes. Modern fleet of loading equipment.
Infrastructure and security
The whole territory of the complex is fenced and has asphalt and concrete pavement, a checkpoint is installed.
>7 Ha
Total area of the territory
>15000 sq.m.
Dry storage area
3500 TEU
Container yard
Dry port «NOVOROSSIYSK»
Dry warehouses №1 class A - 7000 sq.m. №2 class B - 3000 sq.m. +1268 sq.m. - reconstruction №3 class B - 5000 sq.m. +5000 sq.m. - reconstruction №4 class B - 2000 sq.m. - reconstruction №5 class B - 300 sq.m. №6 class B - 300 sq.m.
Container yards №1 - 728 TEU №2 - 1352 TEU №3 - 690 TEU №4 - 680 TEU
New container yard- coming soon 0.5 Ha for 1000 TEU
Our advantages
• The synergy of the ports of Novorossiysk and Gayduk makes it possible to avoid downtime when loading shiploads. • Possibility to accumulate large shiploads and avoid ship and railcar downtime. • Unique optimized logistics solutions with individual customer service.
Our competencies
• Handling cargo using logistical docking of vehicles at our terminal, regardless of the busy infrastructure of Novorossiysk and its marine terminals. • Acceptance of cargo, processing according to customer requirements, loading into a container and further road delivery to the port ("last mile"). • Consolidation of container shipments with further delivery to the port terminals and back to the dry port of NOVOROSSIYSK, avoiding additional storage costs at the port and problems with constant loading of rail infrastructure on the approaches to Novorossiysk. • A range of services for cross-docking transshipment of dry and temperature cargo. • Services for charging, storage and maintenance of REF containers. • Oil transshipment and grain handling facilities.
Our capabilities
Location
Exceptional location in Novorossiysk
Operating time
Working in 3 shifts - 24 hours a day, 7 days a week
Types of cargo
Handling of all types of cargo
Equipment
Modern fleet of loading equipment
Partners
Partnerships with container lines, long-term contracts with customers, availability of drains.
Phased construction
It is possible to build dry terminals and put them into operation in stages, as well as to develop the complex by adapting the facilities for any cargo.
Refrigerated containers
Dry port «NOVOROSSIYSK» has a dedicated area to handle refrigerated containers and related refrigerated equipment, and can perform the following work and services:
Connection
Simultaneous connection of 10 units5of 40 REF;
Possibility to expand the number of connected ref. containers up to 130 units;
online monitoring of the temperature condition.
Service
Setting up the initial start-up operation of the refrigeration container;
Output of the ref. container to the operating mode;
Service maintenance of the container's refrigeration equipment.
Additional services
Issuance of PTI certificate for container line;
Installation of diesel generator on ref. containers on the railway platform as a part of mechanical sections or separately.
We cooperate
We are trusted
Oil transshipment
Dry port «NOVOROSSIYSK» allows the transshipment of vegetable and mineral oils:
Transshipment of oils from rail tank into flexi-tanks for further shipment by containers
Transshipment of oils from truck tank into flexi-tanks for further shipment by containers
2 units high-precision platform scales
Handling per day:
up to 15 rail tank
up to 25 truck tank
Dry port «NOVOROSSIYSK»
• 8 km to Novorossiysk seaports • Direct access to seaports and terminals • 6 covered warehouses, class A and B • 5 container yards
Presentation
Dry port «NOVOROSSIYSK» to service cargo flows of Novorossiysk seaport