A new project of industrial and warehouse real estate in the Light industrial format with blocks starting from 1494 m2
Location
The object is located in the south of the Moscow region (Byakontovo, district Podolsk), check-in from Simferopol highway (M–2). Distance from MKAD - 11 km.
Description
The M-2 Light Industrial production and warehouse complex is located on an area of 18 hectares and consists of 73 standard Light Industrial blocks with a minimum self-contained unit and a mezzanine of 745 m2.Standard blocks of class "A" and "B+". The total area of all buildings is more than 90,000 m2, of which the total storage area is 88,560 m2. The complex also provides an area for freight transport of more than 5 hectares. Modern high-quality materials and technologies at the level of international standards were used in the construction. The possibility of customization of the storage area and the mezzanine according to customer requirements.
Technical equipment
Each building is equipped with communication systems: water supply, storm and central sewerage, electricity, gas supply. All systems work by connecting to city and private networks. The warehouse and office premises are equipped with central security and fire extinguishing systems. The management company provides tenants with all modern telecommunication services, maintenance, cleaning and garbage collection.
Infrastructure and security
The whole territory of the complex is fenced, provided with access control and video surveillance systems, has asphalt and concrete pavement, a checkpoint is installed.
Master plan
PWC «M-2» Light Industrial
18 Ha
Building area
88 560 m2
Area of objects
73 blocks
Number of objects
PWC «M-2» Light Industrial
Unique location 11 km from MKAD along Simferopolskoe highway (M-2) 8 km to Podolsk (M-2) The nearest settlements: Podolsk, Domodedovo, Щербинка, Bytovo
Transport accessibility 15 min. walk to Bykovka bus stop 15 min. from m. Anino by public transport 15 min. from MKAD by car
Construction stages
The construction of the M-2 Light Industrial complex, an environmentally friendly and climate-safe complex, is carried out in two stages. The construction of the first stage is scheduled for the third quarter of 2025.. The general completion of the construction of this innovative commercial facility is scheduled for the II-III quarter of 2026.
Second stage: III-IVcent. 2026
Blocks: 13 шт
Modification: 1.1/1.2+3.1/3.2
Building area: 18 Ha
Parking area: 5 Ha
First stage: II-IIIcent. 2026
Blocks: 60 pcs
Modification: 2.1/2.2
Our advantages
Format
Modern format of Light industrial - modular production and logistics complex, which is in high demand among small and medium-sized businesses, including small-scale production, transport and logistics services, e-commerce, food preparation, order delivery points, etc.
Capsule concept
Capsule business concept: small-format and multi-purpose spaces. Availability in one place of production facilities that meet specific production conditions, storage and exhibition space, showrooms, offices, meeting rooms, etc.
Modular system
Modular system of premises configuration: possibility of combining and separating premises of different types, increase of blocks, different configurations of mezzanine, office space.
Demand
Demand far outstrips supply.
Accessibility
Excellent transport accessibility and convenient location.
Phased construction
It is possible to build facilities and commission them in stages, as well as to develop the complex by adapting the facilities to meet any needs of tenants.
Light Industrial - a segment of industrial and warehouse real estate consisting of blocks with self-contained modules and a mezzanine.
73 standart blocks PWC «M-2» Light Industrial
• The total area of a typical unit: 1 494 m2. (warehouse 1179 m2, mezzanine 315 m2) • 4 Separate docks for different types of transport.
Minimum self-contained module with a mezzanine: • Total area of the minimum unit: 745 m2. (warehouse 588 m2, mezzanine 157 m2) • 2 Separate docks for different types of transport
Dimensions: 38х35 m2 Warehouse floor load: from 5-6 t/m2 Mezzanine floor load: from 0.5 t/m2 (Option: increase to 1.5 t/m2increase in the mezzanine, crane beam)
Frame: metal structures Walls: 120 mm sandwich panels Roof: membrane, 150 mm thick
Warehouse working height: 9/10/13 m (4/5/6 storage levels) Mezzanine working height: 6.2 / 6.7 m Mark unloading: 0.000 / +1.100 Lifting and sectional doors: 4 pcs on block Dock leveller: 4 pcs on block Bathroom: 1 pcs ( option: 2+utility room) Centralized systems: water supply and sewerage Electricity: 30 kW/h (Option: magnification) Heating: gas (independently per unit) Individual metering devices of the fire safety system
options: Office: 36 m2 (+34m2 2nd FLOOR) Add. bathroom +1 pcs FULL SECOND FLOOR second MEZZANINE with 2 line windows THE RAMP
1 OWNER
MODIFICATION 3.1
MODIFICATION 3.1
MODIFICATION 3.1
EXTERIOR
INTERIOR
MODIFICATION 3.1
Total area: 745 m2
Warehouse area: 588 m2
Mezzanine area: 157 m2
entrance: 2 on front
Mark unloading: +1.100
Warehouse height: 13 м (class A)
Mezzanine height: 6.7 м
Warehouse floor load: 6 т/м2
Mezzanine floor load: 0,5 т/м2
gates: 2pcs(3х3м) + 2 dock levelLer
Bathroom: 1 pcs (standart)
options: Office: 42 m2 (+40 m2 2nd FLOOR) bathroom block: 2+utility block FULL SECOND FLOOR second MEZZANINE with 2 line windows THE RAMP
2 OWNERS
MODIFICATION 3.2
MODIFICATION 3.2
MODIFICATION 3.2
EXTERIOR
MODIFICATION 3.2
INTERIOR
Care and health
By taking a people-centred approach to the design of our facilities, we aim to enhance the daily lives and well-being of our customers' employees through spaces specifically designed for socialising, exercising, eating, taking breaks and more. Whether it's maximising natural light in work areas, workstation and landscape design, employee showers, etc., we strive to create the right conditions for people to feel good about themselves at our facilities.
Health and wellbeing
Catering facilities
Sports halls and grounds
Public conference and recreational facilities
24-hour public showers
Car parks for private vehicles
Car parks for lorries, with equipped rest areas.
Caring for the environment
Rainwater harvesting system
Smart LED lights with motion sensors
Electric vehicle charging station
Solar panels on the roof of buildings (Optional)
Biodiversity-friendly landscaping concept
Management company
Cleaning of public premises, sorting and removal of rubbish
Technical maintenance
Security and access control, video surveillance
Cleaning of the territory, landscape maintenance, gardening